Fsr T3-DV2S User Manual

Browse online or download User Manual for Equipment Fsr T3-DV2S. FSR T3-DV2S User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
FSR
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43072 LIT1519B
T3-DV2S / T3-PC1D INSTALLATION INSTRUCTIONS
INSTALL SHROUD TO UNDERSIDE OF TABLE HOLE WITH WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED COVER SWING DIRECTION.
1.
2.
MAKE ELECTRICAL CONNECTIONS AS REQUIRED AND ENSURE
WIRES PASS THRU PROPER OPENINGS IN THE SHROUD. DROP THE
T3 ASSEMBLY INTO THE HOLE (COVER ORIENTATION IS PRE-SET BY
SHROUD INSTALLATION).
3.
PASS THE DESIRED-LENGTH (2) LONG THREADED ROD THRU SHROUD
AND THREAD INTO T3 ASSEMBLY. TURN THE LOCKING NYLON NUT UP
SNUG AGAINST THE SHROUD BASEPLATE TO PULL THE T3 ASSEMBLY
DOWN COMPLETELY INTO PLACE IN THE TABLE HOLE.
TIE WRAP CABLES TO THE TAB(S) PROVIDED ON SHROUD.
4.
3.50" DIA
THRU TABLE
T3 ASSEMBLY
PRE-CUT
3.50" DIA
HOLE IN
TABLE
ASSEMBLED VIEW
UNDERSIDE VIEW OF SHROUD
1.00" MIN TO
2-1/2" MAX
TABLE
THICKNESS
(3/4" MIN FOR
NO-BUTTON
MODEL)
MODEL ILLUSTRATED
MAY DIFFER FROM
MODEL PURCHASED
#6 / #8 MOUNTING HOLES
TRANSFER HOLES FROM
SHROUD TO TABLE
CABLE TIE TAB
SHROUD
MODEL ILLUSTRATED
MAY DIFFER FROM
MODEL PURCHASED
#6 / #8 x 1/2"
WOOD SCREW
(2) LOCKING NYLON NUT
(2) #6-32 x 2.00" or 3.00" LONG
THREADED ROD
Page view 0
1 2

Summary of Contents

Page 1

FSR244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.420743072 LIT1519B T3-DV2S / T3-PC1D INSTALLATION INSTRUCTIONSINS

Page 2 - INTERCONNECT PC BOARD

POLEPOLESWITCH / LED PC BOARDT3-PC1D / T3DV2S TABLE BOX WIRING PINOUT FOR ONE AND TWO BUTTON / LED MODELSINTERCONNECT PC BOARD ONE BUTTON / ONELED MOD

Related models: T3-PC1D

Comments to this Manuals

No comments